Flats and shared roofs
Who is responsible for the roof on a block of flats or a converted house?
Who must repair a shared roof is set by paperwork, not by who lives under it. Below: where to look, and the rules that apply to the work.
The short answer
Your lease and the title to the building decide it, so read those before anyone orders work. In a block or a converted house, a lease can place the roof with the freeholder or a management company for the whole building, with the cost shared among leaseholders. Never assume the top-floor flat owns the roof above it. Whoever is responsible, flats have no permitted development rights, so planning and Building Regulations questions still arise.
4 min read ยท Part of Roofing in Folkestone

Where the answer is written down
Responsibility for a roof is a matter of ownership and contract, and both are on paper. Look in these places, in this order.
- Your lease. It sets out who repairs the structure, roof included, and how any bill reaches leaseholders, which is why it comes first.
- The title registers for the flat and for the building, which show who owns the freehold and the roof space.
- Any management company or residents' company agreement, if the freehold is held collectively.
- Your service charge accounts, which show past roof spending and any reserve.
A converted house can differ from a purpose-built block, because the conversion may have split the building into flats with a shared freehold, a freeholder who lives elsewhere, or leases of different ages. The same roof can therefore be one party's job in one converted house and a shared bill in the house next door, which is why you read your own documents rather than a neighbour's.
If the documents are unclear, ask for copies from the managing agent or the freeholder, and for a solicitor's view before you agree to pay a share of a bill. Do not rely on what a previous owner told you.
What a roofer can and cannot decide
A roofer can survey a shared roof and say what it needs. What a roofer cannot do is decide who pays, or order work on a roof that someone else owns. Those choices follow the lease and the owner.
So a survey of a shared roof is best commissioned by whoever holds responsibility for it, with the other leaseholders told in advance. It also explains why a quote for a block names the party giving the instruction. On a converted house, a single leaseholder who orders work on the whole roof without agreement can end up carrying a bill that the lease says is shared.
Where the roof is a flat roof over part of the building, the same rule applies: the lease says who looks after it, and the roofer's survey describes the condition. For how the survey notes and quote fit together, see the page on what a roofing quote should include.
We tell you whether the roof wants mending or renewing, and why; the person responsible then decides.
Planning, building control and neighbours
| Subject | What to know |
|---|---|
| Planning | A flat has no permitted development rights, so a change to the outside needs permission |
| Building Regulations | The Planning Portal test applies to the roof and building envelope |
| Party walls | Work to a shared wall can need a notice from the building owner |
| Listed or conservation area | Listed building consent, or a check with the council first |
The planning point comes from the permitted development order, whose definition of a dwellinghouse leaves out any building holding one or more flats, and any single flat inside it. In Canterbury City Council's words, flats and maisonettes do not have permitted development rights, and changes to the outside of a flat need planning permission.
On the Building Regulations side, an application is normally unnecessary for a re-roof under the Planning Portal's two thresholds, and a heavier covering needs approval at any size, so ask building control, or a registered approver, which applies to the building. Our party wall page covers notices where a shared wall is involved.
More questions
Can I repair the roof above my flat myself?
Not safely or necessarily lawfully on your own say-so. If the roof belongs to the freeholder or is held in common, work on it needs their agreement, and the lease may set out how it must be done and charged. Report the leak in writing first, with photographs, and ask who will arrange the survey.
Does a flat roof mean the same as a flat in a block?
No. A flat roof is a roof with a low or no pitch, and a flat is a home within a larger building. A flat can sit under a pitched roof, and a house can have a flat roof. This page is about the flat as a home. Rules for flat-roof construction sit on the flat roofing pages.
More from the blog
All guides and postsTell us what's wrong with the roof.
You'll get one written total price.




